Before you start repairs in the bathroom or bathroom, you must first get rid of the plumbing and tiles installed there and tiles.
When removing tiles, do not forget to put on gloves and glasses, they will save you from falling pieces of tiles flying away during dismantling.
After the tile is repulsed from the walls, you need the same chisel with which work was carried out, repel the remnants of the glue that remained on the wall.
After dismantling, you need to check the evenness of the walls, because even small irregularities, later they will look ugly. So that this does not happen, with the help of a plumb line we find errors and remove them. Using the square you need to check all the corners. Each angle should be ninety degrees, if this is not, then all the corners are plastered and fit under this value. Decide on the location of the sink and bath, as well as the furniture that you are going to put there.
If, nevertheless, after all the measurements taken, there are shortcomings, it is necessary to arm yourself with a bucket, a construction mixer, a level, a trowel and various spatulas. First of all, the walls are aligned, and then the floor.
After all the shortcomings are fixed, you need to make a mixture of glue and water. To make the mixture you need a mixer and a bucket. The mixture is covered in small portions, for better mixing of the composition.
Laying tiles, necessarily done from the bottom up. The first row is checked using the level, it should be horizontal. A gap of two millimeters is made between the tiles. It is necessary so that when the temperature changes, the tiles do not fall off and not crack.