The land surveying of the land is necessary to determine the boundaries, it is carried out by a geodetic way, directly on horizontal areas. Before conducting survey, preliminary engineering and geodetic work is needed, and their cost depends on the area of the site.
Why is this procedure needed and whether it is necessary?
The purpose of land surveying is the installation and consolidation of the boundaries of the Earth for use, as well as the determination of the area of the site and its boundaries. After the relevant works on their results, a package of documents will be ready for subsequent legal execution.
The land surveying of the Earth is necessary in the following cases:
Donation of the site;
Exchange of plots;
Purchase or sale;
In privatization;
Land rental for construction.
Survey is not necessary if the site is inherited with the consolidation of property rights in the proper form. To make transactions, you need to register a plot in a single state register.
Geodetic work for land survey includes:
Coordination of borders;
Plan formation;
Establishment and consolidation of signs on the ground;
The establishment of the area, according to the received coordinates;
Preparation of documents;
Their transfer to the Department of Land Resources.
To perform work, you should contact the geodetic company and provide a passport, cadastral plan, documents for the site confirming the ownership right.
The order of land surveying is as follows:
First, information is collected about the site;
Then clarify the boundaries of the site;
Geodetic survey;
Plan development;
Providing this plan to Rosreestr, where they draw up a cadastral passport. The cadastral plan indicates the cost of the plot, the category of land and its area.
Landing can only be carried out by a cadastral engineer with a certificate that works in a specialized company. Study the prices, select a specialist and draw up a contract. After that, agree on the date and time of work.
Experts believe that the most difficult thing is the coordination of borders. All interested parties should coordinate them, individually or at a general meeting. The act records disagreements that are regulated in court. And with the errors made when surveying, the court may recognize the plan invalid. It is believed that boundary disputes in court are the most time -consuming process.