First you need to measure the height and perimeter of the wall, which must be lined. These parameters do not include door and window openings. When acquiring a full set of panels, there are already chasing and fasteners – these are brackets, platbands, fillets, skirting boards, etc.D. If you have all components, you can proceed to the installation. Do not forget to buy a water meter in advance – Triland now it costs inexpensively.
A crate is made from wooden rails and bars, on which wall panels will be laid. The number of planks and rows of this frame will depend on the parameters of the room. The crate should be installed at the edges of the openings of windows and doors, the distance between the strips should be about half a meter. Reiki and bars are fixed with screws. Then the level and roulette is installed in internal and external profiles and angles. Leaving a gap of 5 mm, the first panel is installed in the grooves of accessories. In several places along its length with nails, brackets on the bars are fixed, where the groove of the panel should enter the mounting bracket.
In the groove of the first panel, the crest of the following is inserted, where both are connected by brackets. Also laid the rest of the panels. When laying the last panel, it is first started in the final accessory, and then a groove is introduced into the previous groove, but not fixed. The installation of wall panels is suitable for any room.